IMG 3240 Pano

East Wick - Phase 1

2014 - 2021

Scroll
East Wick and Sweetwater (EWSW) defines the western edge of the Queen Elizabeth Park and plays an important role in mending the gap in the urban fabric between Hackney Wick and the Olympic Legacy communities.
Show info

East Wick and Sweetwater (EWSW) defines the western edge of the Queen Elizabeth Park and plays an important role in mending the gap in the urban fabric between Hackney Wick and the Olympic Legacy communities.

Location:
London, UK
Client:
Balfour Beatty
Places for People

Role:
Masterplanner, Architect

Specificity

The first phase includes 850 homes – townhouses, mews houses, studios and flats – as well as a new primary school and two new nurseries. The site is immediately adjacent to Here East, which was once the Press and Broadcast Centres for the Olympic and Paralympic Games and is now London’s new creative campus for innovation. This juxtaposition of homes and a large-scale legacy venue is repeated across East Wick and Sweetwater, with domestic development embracing and carefully framing the grandeur of the Olympic venues that remain on the site.

The character of the neighbourhoods celebrates the light industrial heritage of the area with imperfect, robust steel frames, an emphasis on planting and moments of colour, and opportunities for local artistic street expression.

read more about the wider masterplan:
East Wick and Sweetwater Masterplan
London, UK

Three of the buildings, providing around 200 new homes, use a pre-fabricated lightweight steel primary structure, a system which reduces sub-contractors and trades on site, increases speed of delivery and reduces the overall weight – an important consideration in light of the Elizabeth Line tunnels below ground.

A new diagonal link provides a glimpse to the Velodrome in the Queen Elizabeth Olympic Park, and in the opposite direction to the City of London’s iconic skyline. A swathe of the park is pulled into the residential neighbourhood to bring green space to the doorstep of the new homes. The scheme forges new connections, both physically and visually.

210 N112

Sustainability

The energy strategy for the first phase of the masterplan follows the London Plan’s Energy Hierarchy approach of using less energy (‘Be lean’), supplying energy efficiently (‘Be clean’), and using renewable energy (‘Be Green’). But we’ve pulled out all the stops to far exceed this. All homes will comply fully with The Fabric Energy Efficiency Standard (FEES) set by the Zero Carbon Hub, which sets the maximum space heating and cooling energy demand for zero-carbon homes.

One of the aims for East Wick has been to create the most sustainable community in the UK, with a focus on high energy efficiency, low levels of carbon emissions, reduced water use, materials with high recycled content, climate change resilience, and high-quality and diverse public spaces. We’ve worked hard to reduce the impact on the environment during construction and to make this a place where everyone, whatever their situation, can live and work sustainably.

IMG 3200

Awards

Year
Category
Award
Status
2022
Pineapple Awards
Place in Progress
Short-listed
Key Project Contact